×

UPSC Courses

DNA banner

DAILY NEWS ANALYSIS

GS-III :
  • 20 July, 2020

  • 5 Min Read

Zonal Master Plan for the Bhagirathi Eco-Sensitive Zone 

Zonal Master Plan for the Bhagirathi Eco-Sensitive Zone

GS-Paper-3 Environment (PT-MAINS)

Recently, the Ministry of Environment, Forest and Climate Change (MoEF&CC) has approved the Zonal Master Plan for the Bhagirathi Eco-Sensitive Zone to pave the way for faster execution of Char Dham Road Project.

Background: In 2012, the MoEF&CC issued a gazette notification declaring the watershed area along the stretch of river Bhagirathi, covering 4,179.59 sq km from Gaumukh to Uttarkashi, an Eco-Sensitive Zone (ESZ). ESZs are the ecologically important areas designated to be protected from industrial pollution and unregulated development under the Environment Protection Act of 1986.

The 2012 notification was issued keeping in view the requirements of the local people without affecting their rights and privileges and also ensuring eco-friendly development for their livelihood security. It sought to protect the entire fragile Himalayan region by restricting hydropower projects of over 2 MW, riverbed mining and change of land use.

However, it was amended in 2018 following Uttarakhand government’s objection that the notification was ‘anti-development.’ The 2018 amendment approved land use change to meet the local needs including civic amenities and other infrastructure development in larger public interest and national security with the prior approval of State Government with due study of environmental impacts. It also allowed cutting of hills in eco-sensitive areas with proper study and construction on steep slopes in exceptional cases for the benefit of the community.

Zonal Master Plan (ZMP):

  • The Bhagirathi Eco-Sensitive Zone notification mandates the State Government of Uttarakhand to prepare ZMP to be implemented under the supervision of the Monitoring Committee.
  • The ZMP is based on watershed approach and includes governance in the area of forest and wildlife, watershed management, irrigation, energy, tourism, public health and sanitation, road infrastructure, etc.
  • Watershed development approach is based on participatory planning following a bottom-up approach for developing a context appropriate plan for execution, strengthening of local level institution, conservation and appropriate management of watershed’s natural resources.
  • Watershed is a geo-hydrological unit draining into a common point by a system of drains.
  • The approval of ZMP is expected to give a boost to conservation and ecology of the area and also to undertake developmental activities as permitted under ZMP.

Char Dham Road Project:

The Char Dham project proposes to provide all-weather connectivity to Yamunotri, Gangotri, Badrinath and Kedarnath, and has 53 projects of 826 km length, involving an investment of Rs. 12,000 crore. Bhagirathi is the source stream of Ganga. It emanates from Gangotri glacier at Gaumukh at an elevation of 3,892 m.

Concerns:

  • In a report prepared after the Kedarnath disaster (2015), the Geological Survey of India stated that road construction in mountains reactivates landslides as it disturbs the ‘toe of the natural slope of the hill’.
  • The Himalayas is the region where Indian tectonic plate goes under the Eurasian tectonic plate.
  • Himalayas are in seismic zone V, thus a major earthquake can happen anytime.

Source: PIB


Formation Day

On 1st November, eight Indian states—Andhra Pradesh, Chhattisgarh, Haryana, Karnataka, Kerala, Madhya Pradesh, Punjab, and Tamil Nadu—along with five Union Territories—Andaman and Nicobar Islands, Chandigarh, Delhi, Lakshadweep, and Puducherry—celebrate their Formation Day. This date marks an important milestone in India

Turtle (Kachhua) Wildlife Sanctuary

The Turtle Wildlife Sanctuary, also known as the Kachhua Sanctuary, is located in the Varanasi district of Uttar Pradesh. It is recognised as India’s first freshwater turtle wildlife sanctuary, established to conserve endangered turtle species and support the ecological health of the Ganga River. Location and Extent The sanctuary co

Introduction of AI and Computational Thinking (CT) in

The Ministry of Education plans to introduce Artificial Intelligence (AI) and Computational Thinking (CT) from Class 3 onwards in the 2026–27 academic year. This initiative is part of the National Curriculum Framework for School Education (NCF-SE) 2023 and aligns with the National Education Policy (NEP) 2020. The aim is to prepare student

Sal Tree

Scientists from the Environment Department of Himachal Pradesh University (HPU) in Shimla have recently revealed that the Sal tree (Shorea robusta) is the most effective natural air purifier for combating rising pollution levels. Their findings highlight the tree’s superior capacity to trap dust, absorb gases, and cleanse the air compared

US Resumes Nuclear Weapon Testing

The President of the United States has ordered the resumption of nuclear weapon testing after a gap of 33 years, the last test being in 1992. This decision marks a significant shift in global nuclear policy and has far-reaching implications for geopolitics, the environment, and international security. Status of Global Nuclear Weapon Testing

DNA

03 Dec,2025

Toppers

Search By Date

Newsletter Subscription
SMS Alerts

Important Links

UPSC GS Mains Crash Course - RAW Prelims Answer Key 2024